On september 2014 one of our best clients presented us a new challenge, which was to supply a hydraulic 10.650kg arts lift for one of the most important museums in the world.

After it was carefully designed, the overall manufacture took 12 weeks and the result is a top quality equipment, ready to safely transport large art pieces for the world to see.

Download Victoria & Albert